The Kimberley Prospector

Durban

Fix water before logos’: eThekwini’s R2.8m rebranding plan under fire – The Post

RSS
THE eThekwini Municipality’s R2.8 million logo redesign has sparked outrage among Durban residents who face daily water outages and crumbling …

Read more: Fix water before logos’: eThekwini’s R2.8m rebranding plan under fire – The Post

Tags:

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top