The Kimberley Prospector

DFA

Kimberley water pipeline filling amid sweltering temperatures

RSS
Eskom has completed repairs on the 133 kV line and is testing it, while the Riverton Water Treatment Plant resumes pumping, with water supply to Kimberley expected to return at 6pm as a 38 °C heatwave with extreme UV levels continues.

Read more: Kimberley water pipeline filling amid sweltering temperatures

Tags:

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top